Calculating method of anchor jacked pile while sinking 錨桿靜壓樁擠土效應(yīng)的計(jì)算
Working mechanics and applications of anchor static jacked pile 錨桿靜壓樁工作機(jī)理及應(yīng)用
Numerical analysis of jacked pile driving 靜壓樁沉樁過程的數(shù)值分析
Calculating jacking resistance of jacked pile by using beating counts of standard penetration test 利用標(biāo)貫擊數(shù)估算靜壓樁的沉樁阻力
This paper introduces the technique about pit - jacked pile and building correction to replace by rising 本文對坑式靜壓樁技術(shù)和頂升糾偏技術(shù)作介紹。
Pit - jacked pile is a new technique as building reinforces and it has some special advantages 坑式靜壓樁作為一種地基托換加固新技術(shù),其施工方法具有獨(dú)特的優(yōu)點(diǎn)。
This paper will expatiate the interaction theory in pile and soil , make elastic - plastic analysis for soil around pit - jacked pile 本文對坑式靜壓樁的樁土共同作用進(jìn)行分析。
So it is important for engineering application that compacting effects of jacked pile are effectively predicted and construction measures that can decrease the compacting effects of jacked pile are taken 因此,能有效地預(yù)估靜壓樁產(chǎn)生的擠土效應(yīng)以及采取能夠減少擠土效應(yīng)的施工措施都具有非常重要的工程意義。
This technique is widely used by many years " popularization . now pit - jacked pile can be applied in some other projects such as correction , ground strengthening and temporary shoring 經(jīng)過幾十年的推廣使用,目前在很多地區(qū)已經(jīng)廣泛使用,其使用范圍也從單一的托換加固發(fā)展到糾偏、補(bǔ)強(qiáng)加固、臨時(shí)支撐等工程。
The expressions of displacement fields of dorsal and frontal surface for two piles , row piles and group piles are derived . the solution taking into consideration the effect of construction sequence of jacked pile accords with the actual engineering 該式考慮到了沉樁施工順序的影響,較各樁的簡單疊加更符合工程實(shí)際情況,而且能夠簡化為不考慮施工順序的靜壓群樁擠土位移場的解答。